Project name: NAM CONG 2 - LAOS Hydropower
Construction contractor: Hoang Anh Attapeu Electric Company Limited
Location for implementing the project: Phuvong district, Attapeu province, southern of Laos
INSTALLATION OF MONITORING EQUIPMENT NAM-CONG 2-LAO
I. Project introduction:

The total installed capacity of Nam Cong 2 project has an installed capacity of 66 MW, an average power output of 263.22 million kWh. With a total investment of US $ 78,980,000, the project was started in the first quarter of 2011 and is expected to be completed in the second quarter of 2017.

The project not only improves the quality of life of Attapeu people but it also contributes to creating jobs for thousands of workers in one of the poorest provinces in Laos.

II. Provided equipment:

 NO.

Name of Items

 Quantity

 Manufacturer

1

Joinmeter - VW CRACKMETER 100MM
Model:0D313S100VW

10 pcs

Sisgeo - Italy

2

Impact pressure - ELECTRICAL PIEZOMETER 1.0 MPA
Model: 0P235S4100

2 pcs

Sisgeo - Italy

3

Water level meter - VENTED PRESSURE TRANSDUCER 100 KPA
Model: 0P252R00100

3 pcs

Sisgeo - Italy

4

Piezometer - VW PIEAZOMETER 2MPA
Model: 0PK20SE2000

6 pcs

Sisgeo - Italy

5

Signal cable 4 core - 22AWG

3000 m

Sisgeo - Italy

6

Datalogger – OMNIA CAB2

Model: 0OMINACAB20

1 pcs

Sisgeo - Italy