SUPPLY AND INSTALLATION OF THAN RIVER RESERVOIR MONITORING SYSTEM

SUPPLY AND INSTALLATION OF THAN RIVER RESERVOIR MONITORING SYSTEM

  •   25/07/2021 12:36:00 PM
  •   Viewed: 92
  •   Feedback: 0

TESTING, INSPECTION, MONITORING SERVICES  

  •   16/05/2021 05:39:00 PM
  •   Viewed: 446
  •   Feedback: 0
HOTEL REINFORCEMENT HOLIDAY BEACH

HOTEL REINFORCEMENT HOLIDAY BEACH

  •   09/03/2021 01:40:00 PM
  •   Viewed: 658
  •   Feedback: 0
REPAIRING, REPLACING HOA XUAN BEARING PAD

REPAIRING, REPLACING HOA XUAN BEARING PAD

  •   08/03/2021 11:00:00 AM
  •   Viewed: 724
  •   Feedback: 0
Project: Repairing damaged Nguyen Van Troi bridge.

Project: Repairing damaged Nguyen Van Troi bridge.

  •   08/03/2021 10:52:00 AM
  •   Viewed: 638
  •   Feedback: 0
STRENGTHNING SUPERSTRUCTURES BY CFRP OF BRIDGES ON THE NATIONAL HIGHWAY NO. 1 A

STRENGTHNING SUPERSTRUCTURES BY CFRP OF BRIDGES ON THE NATIONAL HIGHWAY NO. 1 A

  •   06/03/2021 10:37:00 AM
  •   Viewed: 819
  •   Feedback: 0
REINFORCE THE BRIDGE ON THE ROUTE TO HOI VAN THERMAL POWER PLANT, BINH DINH PROVINCE

REINFORCE THE BRIDGE ON THE ROUTE TO HOI VAN THERMAL POWER PLANT, BINH DINH PROVINCE

  •   26/02/2021 10:19:00 AM
  •   Viewed: 546
  •   Feedback: 0

HOTEL REINFORCEMENT HOLIDAY BEACH

  •   27/01/2021 02:47:00 PM
  •   Viewed: 637
  •   Feedback: 0

REPAIRING, REPLACING HOA XUAN BEARING PAD

  •   26/01/2021 04:46:00 PM
  •   Viewed: 562
  •   Feedback: 0
Construction and reinforcement of structures with CFRP carbon fiber fabric.

Construction and reinforcement of structures with CFRP carbon fiber fabric.

  •   23/01/2021 08:38:00 AM
  •   Viewed: 316
  •   Feedback: 0
THUAN PHUOC BRIDGE MAINTENANCE AFTER 10 YEARS OF USE 

THUAN PHUOC BRIDGE MAINTENANCE AFTER 10 YEARS OF USE 

  •   01/03/2020 11:15:00 PM
  •   Viewed: 354
  •   Feedback: 0
Project: Maintenance Thuan Phuoc Bridge
Investor: Danang Department of Transport
Project operating : Management board of construction and maintenance of transport infrastructure
Construction unit: BKG joint stock company
INSTALLATION OF MONITORING EQUIPMENT NAM-CONG 2-LAO

INSTALLATION OF MONITORING EQUIPMENT NAM-CONG 2-LAO

  •   27/02/2019 02:29:00 PM
  •   Viewed: 522
  •   Feedback: 0
Project name: NAM CONG 2 - LAOS Hydropower
Construction contractor: Hoang Anh Attapeu Electric Company Limited
Location for implementing the project: Phuvong district, Attapeu province, southern of Laos
Installment of Monitoring equipment of Embankment on soft soil

Installment of Monitoring equipment of Embankment on soft soil

  •   27/02/2019 02:06:00 PM
  •   Viewed: 507
  •   Feedback: 0
Monitoring the foundation pit of Da Lat Center

Monitoring the foundation pit of Da Lat Center

  •   08/01/2019 08:37:00 AM
  •   Viewed: 712
  •   Feedback: 0
Project: Monitoring the foundation pit of Da Lat Center.
Location: Da Lat city – Lam Dong province.
Investor: Len – Nguyen joint stock company.
Contractor: Hoang Lien Son construction company.
Wastewater treatment works and surface water of EaDar industrial cluster

Wastewater treatment works and surface water of EaDar industrial cluster

  •   08/01/2019 08:23:00 AM
  •   Viewed: 683
  •   Feedback: 0
Project: Wastewater treatment works and surface water of EaDar industrial cluster
Investor: EaDar Industrial Cluster Management
Type and level of works: Technical infrastructure
Technical level: Level IV
Waste water treatment plant for Hiep Duc rubber processing factory

Waste water treatment plant for Hiep Duc rubber processing factory

  •   08/01/2019 08:17:00 AM
  •   Viewed: 685
  •   Feedback: 0
Investor: QUANG NAM RUBBER COMPANY LIMITED
Consultance : BKG joint stock company